Our Projects
- Home
- Projects

Data Center
NEOM & HORIZONS
- Area: 22500 m^2
- Excavation, Backfilling Works
& Sub structure concrete works.

Vista Sharma Resort
NEOM
- Project management and contracting.
- Establish new water supply networks.
- Apply new extension power lines.

MBC studios
FMC
- Area: 7400 m^2
- Excavation, Backfilling Works
& Sub structure concrete works.

Sewage water pipelines
General Directorate of water in Al-Qassim
Region
- Extension of 1600 mm of concrete pipes lined in the Qassim region, Buraydah, with a length of 6 KM.

Service tunneis for temparary road of THE LINE
FMSCO
- Supply and apply concrete works box culvert
and pipe culvert for the service road of
THE LINE Project

Temparary water transmission line in NEOM (THE LINE)
CHINA POWER
- Extension water pipes 629 mm diameter lines,400 mm HDPE Pipes - SDR 9 & 11

Servuce tunneis for temparary road of THE LINE
ALHARBI
- Supply and apply concrete works box culvert
and pipe culvert for the service road of
THE LINE Project

Desalination water transmission line project form Jubail to Riyadh
Saline
Water
converion
Corporation
&
Al-Rashid
- Extension of 2200 mm diameter carbon steel
lines, 20 km long.

NEOM infrastructure works
NESMA
- NEOM
- Infrastructure works including sewage, water supply, fire fighting, irrigation and concrete works.

Solid waste-RMP- cleaning works
MASAR
AlBunian
Royal
Commission
for AIUIa.
- Tranferring waste and soil materials with
segregation, 250.000 m^3

MBL - NEOM
CHINA POWER
- Excavation, backfilling and fence works.